CAPSULE MOCK-UP PRODUCTION CONTINUES

The first module of full-scale capsule is built up today! The 8-feet-diameter unit only took team mock-up 4 hours to assemble. Pieces of plywood were pre-fabricated by CNC machine, which led to highly accurate manufacture. The complete of first module proves the success of structure,material, as well as the way pieces were connected.

Mock-Up construction

Mock-Up

 

About Suprastudio

“Industry often uses the language of architecture to speculate on the future of their fields. SUPRASTUDIO works with these partners in collaborative research, and opens up the future possibilities for architecture, from the outside in.”

Hitoshi Abe
Chair, UCLA Architecture & Urban Design

Featured Video

Connect

Subscribe Scroll to Top